For the wires coming from the control horns on the elevators, I threaded single strands of suture through the holes molded in the horns, then through holes drilled into the stabilizers. I threaded the suture so both ends ended up passing though the lower horn last. Tension was maintained using metal clips for weight. A drop of super glue secured both ends of the suture.